Barrie Campus, Sustainable Technology Building Geothermal Solutions has completed the drilling portion of the project, 42 boreholes 275' deep, the tie in is expected to take place late May 2009
Click thumbnail to enlarge photograph.
10 Ton Vertical Earth Loop System
Uxbridge, ON 10 ton vertical Earth Loop system. All vertical bores at 200'. This project was completed using our recently aquired new Simco 2800 mounted on an International 4200.
Click thumbnail to enlarge photograph.
6 Ton Horizontal Earth Loop
Mansfield, Ontario Each trench is 300 ft long X 5 ft wide. Each trench will hold 3/4" circuit piping and provide enough capacity for 2 tons of equipment. The trenches are dug in a farmers field and crop was planted the following spring.
Click thumbnail to enlarge photograph.
33 Ton Vertical Earth Loop
Schomberg, Ontario Each vertical bore was drilled to a depth of 205 ft. Drilling time took 6 days with two Drilling rigs. New Home Construction. Geothermal Solutions also completed the tie-in, and interior piping on this project.
Click thumbnail to enlarge photograph.
12 Ton Vertical Earth Loop
Uxbridge, Ontario Each vertical bore was drilled to a depth of 205 ft. Drilling time took 4 days to complete all 12 vertical bores. New home construction. Geothermal Solutions also completed the tie-in on this project as well.