6 ton horizontal – Terra Nova , Ontario
A six ton Hoirzontal loop was installed in this new construction home. This project was completed in the summer of 2011. This loop was challenging to install because of the high water table and the trenches continuously had to be pumped out. Geothermal Solutions completes all of the excavation and laying of pipe to ensure proper depth and spacing is attained.